NANC Change Orders

The NANC Change Order section contains descriptions of the business functionality of the Number Portability Administration Center (NPAC) Service Management System (SMS) as defined by the Local Number Portability Administration Working Group (LNPA WG), which has a direct relationship to the processes and systems that each Service Provider uses to participate in LNP.

When a change in the NPAC software design is discussed at  the LNPA WG, the proposed change eventually is described in the form of a change order.  The change order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal.  As discussions progress, the technical portion of the change order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented.  (Operational impacts of a change order are described in "Method & Procedures" documents issued before the change order is implemented.)  In this section of the NPAC.com web site, all change orders ever considered are listed.  The final change order document and the LNPA WG discussion notes, the change order's status, and the identity of the software release in which the change order was implemented are provided here.

 The status of a change order may be either Closed, Open, Implemented, or Requested.  These terms are defined as follows:

  • Closed – The change order was considered and rejected.
  • Open – The change order has been considered and there may be further discussion.
  • Implemented – The change order was adopted and has been implemented in the NPAC system.
  • Requested – The LNPA WG has asked the NAPM LLC to arrange for the change order's implementation, but the change order is not yet implemented.

Change Order Summary sent to LNPA WG distribution --> Change Orders

Change Order Implemented List sent to LNPA WG distribution --> Implemented Change Orders

NANC Change Orders

Change Order Date Originated Description Status
NANC 005 01/27/1997 Removal of Section 1.7 Related Publications Implemented
NANC 004 01/27/1997 Removal of Assumptions Implemented
NANC 003 01/27/1997 Removal of Unnecessary Illinois references Implemented
NANC 002 01/27/1997 Preface on Number Scheme Implemented
NANC 001 01/27/1997 Document Title Changes Implemented
ILL 188 02/24/1997 FRS RR5-38.3 Consistency Problem Implemented
ILL 187 02/22/1997 NXX split handling for 6 digit Closed
ILL 183 02/14/1997 Download of Service Provider Data ASN.1 Issue Closed
ILL 181 02/24/1997 Key’s for EACH Service Provider Interface Implemented
ILL 142 01/09/1997 MOC Definition Updates Implemented
ILL 134 01/08/1997 Do Not Allow Port for the New NPA-NXX Involved in an Split Prior to Permissive Dialing Window Closed
ILL 131 12/16/1996 Creation of old SV for Every Change Implemented
ILL 130 01/06/1997 Application Level Errors Implemented
ILL 098 11/19/1996 Limit of Mass Update Range Closed
ILL 079 11/19/1996 Notification Recovery Implemented
ILL 077 11/19/1996 Modification of NPA-NXX effective date Closed
ILL 076 11/19/1996 Portability Area Indicator for Service Providers Closed
ILL 075 Rev 2 02/01/1999 Validate Due Date is > than, or equal to, the NPA-NXX effective date upon Pending Version Creation Implemented
ILL 075 11/19/1996 Validate Due Date is > than the NPA-NXX effect date upon Pending Version Creation Implemented
ILL 067 11/08/1996 DPC Validation Closed
ILL 066 11/08/1996 Network Level Activation Capability Closed
ILL 065 11/08/1996 Network Level Audit Closed
ILL 058 10/29/1996 Single Audit Report Modification Closed
ILL 017 10/15/1996 Report Size Warning Closed
ILL 011 10/17/1996 Portability Area Utilities, Screen, and Report Enhancements Closed