On Thursday July 17 the Detroit SPOC Team met via Conference bridge number, 1-800-593-XXXX passcode "XXXX", at 10:00 AM CDT.

The next meeting will be Thursday July 7/24 9:00 AM CDT via conference call bridge listed above.

Those SPOC’s who took part in today’s meeting were as follows:

Name Company Fax

=============================================================================

*Dick Dowd LLC/ICC Work Shop

*Bob Bartenstein Ameritech

*Hampton Oberle MCI

*Rick Arzadon TCG

*Anne Driscoll MCI

=============================================================================

 

It is assumed that those company’s that will participate in some form of

Inter-Company Testing in Detroit are as follows:

  • Ameritech

    MCI

    TCG

  • All others, by their absence are not being planned for.

     

    =============================================================================

     

    Single Point Of Contact Meeting Issues & Actions

    ==============================================================================

     

    ISSUE: Each participating company needs to determine which specific

  • tests listed in the FCC Field Test Plan available at www.ported.com, that they will be able to take part in.

    ACTION: Each SPOC is to review the FCC Field Test Plan

    with their Task Force to determine which specific test script’s will be able to be performed by their company’s network topography within the Chicago MSA.

    RESPONSIBLES: SPOC Team.

  • STATUS: Assigned June 12

    ISSUE: A certain amount of Network Data information needs to be gathered

  • to assist in putting together the topography in Detroit for testing.

    ACTION: Each SPOC will need to fill in the Network Data form for Detroit

    and send it to Dick Dowd ASAP.

  • RESPONSIBLES: SPOCs

    STATUS: Assigned June 12

     

    LIVNMINWDS0 LIVONIA NW DSO DMS100 LIVONIA/PLYMOUTH 313/542

  • ACTION: Each participating service provider that intends to do any

    inter-company testing in the Detroit MSA needs to determine within which rate centers their switch does business and provide that information to Dick Dowd as soon as possible. July 11th if at all possible.

    RESPONSIBLE: MCI and TCG.

    STATUS: Complete. All three have switches in the Detroit 6 rate

    center. Ameritech MCI and TCG are all looking at Livonia as this would allow Ameritech to test using their DMS-100.

    Livonia was selected.

    Ameritech

  • NPA-NXX 313-542

    TCG

    NPA-NXX 313-853

    MCI

    NPA-NXX 313-452

    General Information:

    Dates

  • 7/17 Network Data Forms due to Dick Dowd from each participating
  • SPOC.

  • Ameritech - Not Ready at this time.
  • MCI - Not Ready at this time.

    TCG - Not Ready at this time.

     

  • 7/17 Testing Matrix due to Dick Dowd from each participating
  • SPOC.

  • Ameritech - Not Ready at this time.
  • MCI - Not Ready at this time.

    TCG - Not Ready at this time.

     

  • 9/8 Earliest date that testing can start in the Detroit MSA

    based upon LNP capable switch dates.

    9/26 Completion of LNP Testing for Detroit.

    Dick Dowd

    Detroit Inter-company Test Coordination Manager

    LLC/Midwest Region

  • 972-498-5069

  • 972-918-1499 fax

    972-498-5022 alternate fax

    Vnet 757-5069

    Pager 1-800-PAGEMCI Pin# 1742797

    Email Richard Dowd / MCI ID: 258-4443

    Internet rdowd@mcimail.com