NANC 106

Digital Signature Definitions

Origination Date :06/07/1997

Originator:AGCS

Description:

The IIS NANC1.1, paragraph 5.2.1.10 Signature, states that the fields specified in the LnpAccessControl are converted to either ASCII or Integer types, and then hashed/encrypted.  Some of these conversions are obvious.  However, it has been requested that the following information be included in the IIS.

 

Field

 

 

Format

 

 

Comments

 

 

systemId

 

 

ASCII

 

 

systemType

 

 

Integer

 

 

e.g. local-sms = 1

 

 

userId

 

 

ASCII

 

 

cmipDepartureTime

 

 

ASCII

 

 

format of

 

“YYYYMMDDHH
MMSS.0Z

 

 

sequenceNumber

 

 

Integer

 

Final Resolution:

This information will be added in IIS 1.3 and IIS 2.1.

Related Release:

1.3

Status: Implemented