NANC 109

Number Pooling

Origination Date :06/09/1997

Originator:NANC

Description:

Number Pooling has been requested for a future NPAC release.  E-mail has been sent to the group to begin initial discussion.

Final Resolution:

Backwards Compatible:  NO

 

This change has been requested for a future release.  Pending INC decision.

 

A separate sub-committee has been formed to address National Number Pooling.

 

During August T&O (Detroit), it was requested that this change order be included when the Mass Update by LNP Type change order (NANC 216) is submitted to the LLCs.

 

Dec Natl N Pool (Las Vegas), the documentation suite (FRS, IIS, GDMO, ASN.1) was finalized.  Submission by the LLCs to Lockheed is expected on 12/28/98.  Move to Release 3.0 list.

 

Aug 10/00 – research by CMA indicated that this change order was rolled into NANC 109 which was part of Release 3.0

Related Release:

3.0.0

Status: Implemented