NANC 160
Single TN in a Range Create
Origination Date :09/17/1997
Originator:AGCS
Description:
The Lockheed implementation does not support subscription version create on a single TN with a TN range where the starting TN equals the ending TN. Perot implementation supports this functionality.
Final Resolution:
Desired behavior should be determined and documented.
A single TN should not be specified as a range.. Lockheed ITP to be updated. Perot to implement change in the future.
Clarification was put in the release 1 IIS per change order 159.
This is in Release 2 (SOW 9).
Related Release:
2.0.0
Status: Implemented