NANC 163
NPA Split Implementation
Origination Date :09/25/1997
Originator:Lockheed Martin Regions
Description:
An issue has been raised in Illinois relating to NPA Splits that may effect ALL LSMS VENDORS!
It was found that (In the Lockheed implementation):
- the new NPA-NXX involved in a split must not exist in the NPAC in the current NPAC implementation.
- the new NPA-NXX is NOT broadcast by the NPAC at any time
- The NPAC changes the existing NPA-NXX to the new NPA-NXX (therefore keeping the same version id as the old for the new. Therefore, not causing any delete for the old NPA-NXX in the Local SMS.
The desired behavior is now defined in a separate document being reviewed by the team on the public web site.
Final Resolution:
Requirements have been finalized in the NANC T&0 meeting on 10/9/1997.
Perot first split for Bell South Permissive Dialing will start 3/1. Bell South will investigate. The Lockheed regions first split permissive dialing period starts 12/13.
New requirements sent in e-mail need to be reviewed.
Closed 11/7/97.
Requirements are available on the web.
Related Release:
1.7
Status: Implemented