NANC 369
Doc Only Change Order for IIS: Flow Updates
Origination Date :10/23/2002
Originator:TSE
Description:
Flow B.5.4.7.3 (SV disconnect with effective release date of ported-pooled-TN), correction changes needed in steps 4 and 5. The current drawing references a donor-disconnect notification going to the Block Holder SOA. These should be changed to a status attribute change (disconnect-pending) to the current SOA. Also, add reference to “Effective Release Date” at end of flow.
Final Resolution:
Pure Backwards Compatible: YES
Change the current documentation to reflect the current behavior.
Nov ’02 LNPAWG, approved, move to next documentation category.
Implemented in IIS 3.2.1a.
Related Release:
Implemented in IIS 3.2.1a.
Status: Implemented