NANC 411
Doc Only Change Order: IIS
Origination Date :04/30/2006
Originator:Neustar
Description:
The current documentation needs to be updated:
1. Part II of IIS, SV Create flows in B.5.1.1 and B.5.1.2, object creation notifications include timer type if supported by the SOA, and business type if supported by the SOA. This is added to the list in step 5. This is already reflected in the GDMO under subscription version NPAC behavior, so no corresponding GDMO change is needed.
2. Part I of IIS, Section 5.3.4, Recovery. The current text incorrectly indicates a failure error (two places), and instead should indicate an abort. “Service Provider and Notification recovery requests can only be sent to the NPAC when the SOA/LSMS is in recovery mode, otherwise an error message
abort is returned.”, and “SWIM based recovery requests can only be sent to the NPAC when the SOA/LSMS is in recovery mode, otherwise an error message
abort is returned.”
Also, add the following text to the SWIM section:
If the Service Provider system returns an invalid ACTION_ID, the NPAC will abort the association.
3. Part II of IIS, Disconnect flows in B.5.4.1 and B.5.4.2. A note should be added to clarify the meaning of donor service provider.
NOTE: The “donor service provider“ is the NPA-NXX Holder, or in cases of a TN within a Number Pool Block, it is the NPA-NXX-X Holder.
4. NANC 399 data, current status. The current documentation lists 399 as “inactive in the NPAC”. This note should be removed from the IIS.
5. Part II of IIS, Exhibit 3, CMIP Error Mapping to NPAC SMS Errors. Several entries need to be updated with the June ’06 version of the error file. Also the format of the table should mirror the actual file. This requires the addition of a column labeled “CMIP Error Number”, between the existing error text and CMIP error type.
6. Part II of IIS, Disconnect flow in B.5.4.1. The extra M-SET steps should be removed. The M-SET that indicates “disconnect-pending” is incorrect. This should be changed to “sending”. The second set of M-SETs should be removed.
7. Part II of IIS, NSP Create flow in B.5.1.2, third part of step 1 (new text in yellow highlights). Also same change (only applicable for non-PTO) for B.5.1.3, B.5.1.11, B.5.2.3, and B.5.2.4.
The following attributes are optional when the subscriptionPortingToOriginal-SPSwitch is FALSE (ignored if value set to TRUE):
subscriptionEndUserLocationValue
subscriptionEndUserLocationType
subscriptionBillingId
subscriptionAlternativeSPID – if supported by the Service Provider SOA
8. Part I of IIS, new sub-section in Chapter 4, Interface Functionality.
Final Resolution:
Func Backwards Compatible: YES
Correct the current documentation.
Implemented in IIS release 3.3.3a 2/28/07
Re #3: also defined Donor SOA, then defined Donor Service Provider as documented in CO.
For #8, clarify the current documentation and current NPAC behavior, by adding the text in the following attachment.
Re #7: intention of CO is to document the implementation, as such document has been updated to indicat End User Location Value/Type and billing ID and Alt SPID can optionally be specified when PTO=FALSE. When PTO=TRU, the SP cannot specify Alt SPID and all other optional attributes are accepted.
Related Release:
Implemented in IIS release 3.3.3a 2/28/07
Status: Implemented