NANC 433
VoIP SV Type
Origination Date :03/12/2008
Originator:LNPA-WG
Description:
Business Need:
During the discussion of FCC Order 07-188, participants agreed that the SV Type values should be modified to align with the definition in the Order.
VoIP SV Type in the FRS-- In both the intro section (1.2.16) and the data model section (SV data model – table 3-6, and Number Pool Block data model – table 3-8), the text for “voIP” should be replaced with “Class 2 Interconnected VoIP”, and “SV Type 5” should be replaced with “Class 1 Interconnected VoIP”.
Final Resolution:
Backward Compatible: YES
Update the FRS accordingly.
Implemented in FRS 3.4.0a 3/19/10
Implemented in 3.4.0 ASN.1/GDMO
Related Release:
Implemented in FRS 3.4.0a 3/19/10
Implemented in 3.4.0 ASN.1/GDMO
Status: Implemented