ILL 134
Do Not Allow Port for the New NPA-NXX Involved in an Split Prior to Permissive Dialing Window
Origination Date :01/08/1997
Originator:WorldCom
Description:
It was requested that a check be put into the NPAC to insure that a pending port was not created for the new NPA-NXX involved in the split prior to the permissive dialing period. It was felt that setting the effective date of the new NPA-NXX to the same time as the permissive dialing period start was not enough of a safe guard.
Final Resolution:
This feature has been requested for Release 4. Detailed requirements need to be developed.
Group felt that this functionality was unnecessary. Originator has been contacted.
Related Release:
N/A
Status: Closed