ILL 183
Download of Service Provider Data ASN.1 Issue
Origination Date :02/14/1997
Originator:MCI
Description:
The NetworkDataDownload ASN.1 definition is as follows:
NetworkDownloadData ::= SET OF SEQUENCE {
service-prov-data [0] SEQUENCE {
service-prov-id ServiceProvId,
service-prov-name ServiceProvName OPTIONAL
},
service-prov-npa-nxx-data [1]
NPA-NXX-DownloadData OPTIONAL,
service-prov-lrn-data [2] LRN-DownloadData OPTIONAL
}
NPA-NXX_DownloadData and LRN-DownloadData both have download reason which basically specify whether to add, delete or modify instances, however, service_prov_data does not. There is no way to indicate that a serviceProvNetwork object has been deleted in a network data download.
Final Resolution:
It is proposed that since service provider deletion is not a frequent activity that addition of this functionality be added in a later release.
The ASN.1 would be modified as follows:
NetworkDownloadData ::= SET OF SEQUENCE {
service-prov-data [0] SEQUENCE {
service-prov-id ServiceProvId,
service-prov-name
ServiceProvName OPTIONAL,
Service-prov-download-reason
DownloadReason
},
service-prov-npa-nxx-data [1]
NPA-NXX-DownloadData
OPTIONAL,
Service-prov-lrn-data [2]
LRN-DownloadData OPTIONAL
}
Sep LNPAWG (Chicago), no longer needed. Move to Cancel-Pending.
Related Release:
N/A
Status: Closed