NANC 010
SystemType ASN.1
Origination Date :03/02/1997
Originator:Perot Systems
Description:
In the ASN.1 for SystemType there is an enumerated type of soa-and-local-sms. This type is present to allow SOA and LSMS system functions to be performed over the same association. It has been requested that support for this enumerated type be optional for the NPAC SMS vendor.
Final Resolution:
IIS modifications were made in the 1.0 release.
Related Release:
1.0
Status: Implemented