NANC 024
IIS 6.5.1.2/6.5.1.3 Flow Modification
Origination Date :03/17/1997
Originator:Perot Systems
Description:
In IIS 1.5 flows 6.5.1.2 and 6.5.1.3 the subscriptionNewSP-AuthorizationTimeStamp should be removed from the text in step c.
Final Resolution:
IIS was modified in the 1.0 release.
Related Release:
1.0
Status: Implemented