NANC 029
IIS subscriptionLNPType Behavior Modification
Origination Date :03/17/1997
Originator:Perot Systems
Description:
In IIS 1.5 the second paragraph referring to log records should be removed since the subscriptionLNPType is not contained in any log record.
Final Resolution:
IIS was modified in the 1.0 release.
Related Release:
1.0
Status: Implemented