NANC 067

Flow 6.5.4.6 Modification

Origination Date :04/11/1997

Originator:Lockheed Martin

Description:

Flow 6.5.4.6 should show in the flow for steps g. and i. In the subscriptionVersionStatusAttributeValueChange notifications (subscriptionVersionStatus=old or active) instead of (subscriptionVersionStatus=old).  The text accurately reflects this but the flow doesn’t.

Final Resolution:

IIS modifications will be made in the 1.1 release.

Related Release:

1.1

Status: Implemented