NANC 082

Audit Download Filtered LSMS

Origination Date :04/18/1997

Originator:NANC

Description:

It has been requested that audits be allowed to audit LSMS’s that have download filtered NPA-NXX’s always or only upon request.  Today audits are not performed on Local SMS’s for filtered NPA-NXX’s.

Final Resolution:

Audit changes have been viewed as a very low priority.

Repair would be to recognize the filter and not add the TN if a missing filtered Tn is found and to delete a filtered TN if found.

Pending DELETE as of 8/22/97.

Related Release:

N/A

Status: Closed