NANC 085
Flow 6.5.5.1 Modification
Origination Date :04/30/1997
Originator:Lockheed Martin
Description:
The IIS flow for conflict (section 6.5.5.1) is missing the message for the modification of the old SP authorization flag to false when an SV is put into conflict. An additional M-EVENT-REPORT message should be sent to both the old and new SP SOAs in the top section of the flow diagram. These steps would be like steps o-r showing the authorization flag set to false after step g.
Final Resolution:
This change would be made in the IIS 1.2.
Related Release:
1.2
Status: Implemented