NANC 103A
Clock Synchronization 5 or 2 Minutes
Origination Date :05/31/1997
Originator:Lockheed Martin Team
Description:
In Chapter 5 of IIS section 5.2.1.6 states clock synchronization should be within 2 minutes, but in another section it states 5 minutes.
Per the following requirement it should be 5 minutes:
R7-105.2 Generalized Time
SOA to NPAC SMS interface and the NPAC SMS to Local SMS interface shall ensure that external messages received have a generalized time in the access control information within 5 minutes of the NPAC SMS system clock.
Final Resolution:
IIS 1.3 and or 2.1 will be updated.
Related Release:
1.3
Status: Implemented