NANC 126
Use of Time in the Due Date
Origination Date :07/17/1997
Originator:Nortel
Description:
It has been determined that the Lockheed System uses the time if specified in the Due Date where the Perot system normalizes the time to 00:00:00.0 when the time is specified. It has been requested that the Lockheed implementation be changed to normalize the time.
Final Resolution:
Lockheed will make the change in a future release (see change order NANC 149) but for release 1 the time will not be specified by vendor systems.
Related Release:
1.5
Status: Implemented