NANC 141
Cancel of Disconnect Pending
Origination Date :08/18/1997
Originator:Lockheed Martin Team
Description:
The requirement R5-71.10 states “NPAC SMS shall set the subscription version status to Active upon receiving a cancellation for a subscription version with a status of disconnect pending.”. However, there are requirements R5-3.10, R5-3.11, and R5-3.12 that define a tunable parameter for retention of canceled versions with a pre-cancellation status of disconnect pending. This tunable is not needed and should be removed. The requirements R5-3.10, R5-3.11, R5-3.12 and the reference to the tunable in the table in appendix C should be removed.
Final Resolution:
The FRS should be updated in the next release.
Closed for FRS release 1.5.
Related Release:
1.5
Status: Implemented