NANC 165
Flow 6.5.5.2 Correction
Origination Date :09/29/1997
Originator:Bellcore
Description:
Step g of flow 6.5.5.2 the diagram reflects an incorrect non-existent notification. The notification in the diagram should match the notification stated in step g.
Final Resolution:
The flow will be corrected in the IIS to reflect the proper notification in the flow diagram.
Related Release:
1.6
Status: Implemented