NANC 172
LSMS accepting downloads in the Flows
Origination Date :11/05/1997
Originator:Perot
Description:
The flows in the IIS do not mention that filtering may occur on downloads to the LSMS’s for subscription versions. They simply state that downloads occur to all LSMS’s. It has been suggested that the words “all LSMS’s” be changed top “all LSMS’s accepting downloads for the NPA-NXX of the subscription version”.
Final Resolution:
The IIS will be updated. Closed 11/7/97.
Related Release:
1.7
Status: Implemented