NANC 176
Modification of Status Change Cause Code
Origination Date :11/15/1997
Originator:Bell South
Description:
A discrepancy was found between the FRS 1.6r equirementsR5-27.3, R5-29.5, and IIS 1.6 flow 6.5.2.4.
Step a in flow 6.5.2.4 states the following:
a. Action is taken by a service provider to modify the subscriptionVersion. The old service provider can only update the following attributes:
subscriptionOldSP-DueDate
subscriptionOldSP-Authorization
We should add the status change cause code should be added as an attribute that can be modified per the FRS requirements.
Final Resolution:
The IIS flow will be updated as well as flow 6.5.2.3. A note will be added to state that the cause code can only be set when the subscriptionOldSP –Authorization is set to FALSE.
Related Release:
1.8
Status: Implemented