------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Notice:

Effective August 1, 2017 the role of Change Management Administrator (CMA) of the Local Number Portability Administration Working Group (LNPAWG) for all US Regions was transferred to Telcordia Technologies, Inc., d/b/a iconectiv.

To contact the iconectiv CMA or to be added/removed from the LNPAWG distribution list please email cma@iconectiv.numberportability.com.

Please note that on or about September 30, 2017 the collection and history of industry documents will be transferred to https://numberportability.com/. Stay tuned for further updates at upcoming LNPAWG meetings and conference calls.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

NANC Change Orders

The NANC Change Order section contains descriptions of the business functionality of the Number Portability Administration Center (NPAC) Service Management System (SMS) as defined by the Local Number Portability Administration Working Group (LNPA WG), which has a direct relationship to the processes and systems that each Service Provider uses to participate in LNP.

When a change in the NPAC software design is discussed at  the LNPA WG, the proposed change eventually is described in the form of a change order.  The change order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal.  As discussions progress, the technical portion of the change order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented.  (Operational impacts of a change order are described in "Method & Procedures" documents issued before the change order is implemented.)  In this section of the NPAC.com web site, all change orders ever considered are listed.  The final change order document and the LNPA WG discussion notes, the change order's status, and the identity of the software release in which the change order was implemented are provided here.

 The status of a change order may be either Closed, Open, Implemented, or Requested.  These terms are defined as follows:

  • Closed – The change order was considered and rejected.
  • Open – The change order has been considered and there may be further discussion.
  • Implemented – The change order was adopted and has been implemented in the NPAC system.
  • Requested – The LNPA WG has asked the NAPM LLC to arrange for the change order's implementation, but the change order is not yet implemented.

Change Order Summary sent to LNPA WG distribution --> Change Orders

Change Order Implemented List sent to LNPA WG distribution --> Implemented Change Orders

Change Order Prioritization Guidelines --> Guidelines Document

NANC Change Orders

Change Order Date Originated Description Status
NANC 113 06/20/1997 ASN.1 and GDMO for Notification Recovery Implemented
NANC 112 06/21/1997 Key Expiration Implemented
NANC 111 06/21/1997 Validation of Association Functions Implemented
NANC 110 06/13/1997 PGP documentation Implemented
NANC 109 06/09/1997 Number Pooling Implemented
NANC 108 06/08/1997 IIS Discrepancy with R5-26 Implemented
NANC 107 06/09/1997 IIS Discrepancy with R5-25 Implemented
NANC 106 06/07/1997 Digital Signature Definitions Implemented
NANC 105 05/31/1997 Download File Formats Implemented
NANC 104 06/01/1997 Edits at Bind Implemented
NANC 103B 05/23/1997 Increase in OSI Selector Size Closed
NANC 103A 05/31/1997 Clock Synchronization 5 or 2 Minutes Implemented
NANC 102 05/23/1997 Key file exchange formats Implemented
NANC 101 05/21/1997 SubscriptionVersionRemoveFromConflict Action Behavior modification Implemented
NANC 100 05/21/1997 NANC IIS 1.1, section 10 Subscription Version Status Row 1 Implemented
NANC 099 05/21/1997 NANC IIS 1.1, section 10 Subscription Version Status Row 2 Implemented
NANC 098 05/22/1997 TSAP data required in FRS Implemented
NANC 097 05/15/1997 OID usage and NpacAssociationUserInfo Implemented
NANC 096 05/12/1997 T2 Timers not on subscriptionVersionNPAC Implemented
NANC 095 05/12/1997 Reference: IIS NANC 1.1, section 4.2.2 Implemented
NANC 094 05/12/1997 IIS NANC 1.1, section 4.2.1 Implemented
NANC 093 05/13/1997 Date and Time in GDMO/ASN.1 Implemented
NANC 092 05/04/1997 Flow 6.5.3.2 Clarification Implemented
NANC 091 05/01/1997 IIS Section 4.2.2 Implemented
NANC 090 04/30/1997 SP Download Indicator Addition to IIS Closed