------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Notice:

Effective August 1, 2017 the role of Change Management Administrator (CMA) of the Local Number Portability Administration Working Group (LNPAWG) for all US Regions was transferred to Telcordia Technologies, Inc., d/b/a iconectiv.

To contact the iconectiv CMA or to be added/removed from the LNPAWG distribution list please email [email protected].

Please note that on or about September 30, 2017 the collection and history of industry documents will be transferred to https://numberportability.com/. Stay tuned for further updates at upcoming LNPAWG meetings and conference calls.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

NANC Change Orders

The NANC Change Order section contains descriptions of the business functionality of the Number Portability Administration Center (NPAC) Service Management System (SMS) as defined by the Local Number Portability Administration Working Group (LNPA WG), which has a direct relationship to the processes and systems that each Service Provider uses to participate in LNP.

When a change in the NPAC software design is discussed at  the LNPA WG, the proposed change eventually is described in the form of a change order.  The change order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal.  As discussions progress, the technical portion of the change order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented.  (Operational impacts of a change order are described in "Method & Procedures" documents issued before the change order is implemented.)  In this section of the NPAC.com web site, all change orders ever considered are listed.  The final change order document and the LNPA WG discussion notes, the change order's status, and the identity of the software release in which the change order was implemented are provided here.

 The status of a change order may be either Closed, Open, Implemented, or Requested.  These terms are defined as follows:

  • Closed – The change order was considered and rejected.
  • Open – The change order has been considered and there may be further discussion.
  • Implemented – The change order was adopted and has been implemented in the NPAC system.
  • Requested – The LNPA WG has asked the NAPM LLC to arrange for the change order's implementation, but the change order is not yet implemented.

Change Order Summary sent to LNPA WG distribution --> Change Orders

Change Order Implemented List sent to LNPA WG distribution --> Implemented Change Orders

Change Order Prioritization Guidelines --> Guidelines Document

NANC Change Orders

Change Order Date Originated Description Status
NANC 065 04/02/1997 Flow 6.5.1.3/6.5.1.4 attributeValueChange Notification Clarification Implemented
NANC 064 04/02/1997 Flow 6.5.1.1/6.5.1.2 objectCreation Notification Clarification Implemented
NANC 063 04/03/1997 Flow 6.5.1.1 and 6.5.1.2 Modifications Implemented
NANC 062 04/03/1997 Filter NPA-NXX Object Behavior Description/Modification Implemented
NANC 061 04/03/1997 SubscriptionVersionModify Behavior Modification Implemented
NANC 060 04/03/1997 Range Operation Clarification Implemented
NANC 059 04/11/1997 Old SP Concurrence Request Notification Implemented
NANC 058 04/01/1997 Data Download for a Modify Implemented
NANC 057 03/27/1997 Digital Signature Clarification Implemented
NANC 056 03/27/1997 Flow 6.5.2.3 and 6.5.2.4 corrections Implemented
NANC 055 03/26/1997 Not recorded Closed
NANC 054 03/26/1997 Definition of Cause Code Values Implemented
NANC 053 03/27/1997 Chapter 10 Modifications Implemented
NANC 052 03/27/1997 Flow 6.5.2.1, 6.5.2.3, and 6.5.3.1 Modification Implemented
NANC 051 03/26/1997 OID Modification Implemented
NANC 050 03/27/1997 Flow 6.5.1.6.2 Clarification Implemented
NANC 049 03/26/1997 Multiple SP Contacts for a Contact Type Closed
NANC 048 03/24/1997 Multiple SPIDs per Service Provider SOA Implemented
NANC 047 03/24/1997 Time Zone Closed
NANC 046 03/24/1997 NPAC to NPAC Closed
NANC 045 03/24/1997 Audit a list of Service Providers Closed
NANC 044 03/24/1997 Effective Release Date Validation Closed
NANC 043 03/20/1997 Report of SPs who initiated Audits for Another SP Closed
NANC 042 03/20/1997 Documentation of lnpLocal-SMS-Name Value Implemented
NANC 041 03/20/1997 SubscriptionModifyData ASN.1 Tagging Correction Implemented