------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Notice:

Effective August 1, 2017 the role of Change Management Administrator (CMA) of the Local Number Portability Administration Working Group (LNPAWG) for all US Regions was transferred to Telcordia Technologies, Inc., d/b/a iconectiv.

To contact the iconectiv CMA or to be added/removed from the LNPAWG distribution list please email [email protected].

Please note that on or about September 30, 2017 the collection and history of industry documents will be transferred to https://numberportability.com/. Stay tuned for further updates at upcoming LNPAWG meetings and conference calls.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

NANC Change Orders

The NANC Change Order section contains descriptions of the business functionality of the Number Portability Administration Center (NPAC) Service Management System (SMS) as defined by the Local Number Portability Administration Working Group (LNPA WG), which has a direct relationship to the processes and systems that each Service Provider uses to participate in LNP.

When a change in the NPAC software design is discussed at  the LNPA WG, the proposed change eventually is described in the form of a change order.  The change order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal.  As discussions progress, the technical portion of the change order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented.  (Operational impacts of a change order are described in "Method & Procedures" documents issued before the change order is implemented.)  In this section of the NPAC.com web site, all change orders ever considered are listed.  The final change order document and the LNPA WG discussion notes, the change order's status, and the identity of the software release in which the change order was implemented are provided here.

 The status of a change order may be either Closed, Open, Implemented, or Requested.  These terms are defined as follows:

  • Closed – The change order was considered and rejected.
  • Open – The change order has been considered and there may be further discussion.
  • Implemented – The change order was adopted and has been implemented in the NPAC system.
  • Requested – The LNPA WG has asked the NAPM LLC to arrange for the change order's implementation, but the change order is not yet implemented.

Change Order Summary sent to LNPA WG distribution --> Change Orders

Change Order Implemented List sent to LNPA WG distribution --> Implemented Change Orders

Change Order Prioritization Guidelines --> Guidelines Document

NANC Change Orders

Change Order Date Originated Description Status
NANC 015 03/05/1997 FRS GDMO Definition Correction Implemented
NANC 014 03/05/1997 GDMO Document References Implemented
NANC 013 03/05/1997 Notification of T2 expiration to Old SP Implemented
NANC 012 05/05/1997 Conflict Restriction Window Tunable Clarification/Modification Implemented
NANC 011 03/05/1997 Business Day Default rewording Implemented
NANC 010 03/02/1997 SystemType ASN.1 Implemented
NANC 009 01/27/1997 Removal of all Requirements in Sections 6.1 and 6.2 Implemented
NANC 008 01/27/1997 Deletion/Modification of Requirements in Section 10 Implemented
NANC 007 01/27/1997 Removal of “NOT A SYSTEM REQUIREMENT” Implemented
NANC 006 01/27/1997 Addition of R5-19.2 and RR5-6.9 Implemented
NANC 005 01/27/1997 Removal of Section 1.7 Related Publications Implemented
NANC 004 01/27/1997 Removal of Assumptions Implemented
NANC 003 01/27/1997 Removal of Unnecessary Illinois references Implemented
NANC 002 01/27/1997 Preface on Number Scheme Implemented
NANC 001 01/27/1997 Document Title Changes Implemented
ILL 188 02/24/1997 FRS RR5-38.3 Consistency Problem Implemented
ILL 187 02/22/1997 NXX split handling for 6 digit Closed
ILL 183 02/14/1997 Download of Service Provider Data ASN.1 Issue Closed
ILL 181 02/24/1997 Key’s for EACH Service Provider Interface Implemented
ILL 142 01/09/1997 MOC Definition Updates Implemented
ILL 134 01/08/1997 Do Not Allow Port for the New NPA-NXX Involved in an Split Prior to Permissive Dialing Window Closed
ILL 131 12/16/1996 Creation of old SV for Every Change Implemented
ILL 130 01/06/1997 Application Level Errors Implemented
ILL 098 11/19/1996 Limit of Mass Update Range Closed
ILL 079 11/19/1996 Notification Recovery Implemented