NANC 380
Doc Only Change Order: IIS Updates
Origination Date :01/23/2003
Originator:TSE
Description:
1. IIS Flow 5.6.1 – Picture indicates “SOA/LSMS”, but title and text refer to LSMS (only).
2. IIS Flow 5.5.5 – Subscription Version Conflict Removal by the old Service Provider SOA. In steps 9 and 11, incorrect reference to RangeStatusAttributeValueChange.
3. IIS Flow 5.1.15.1 and 5.1.16 – SV PTO Resend. Notifications are reversed between Old SOA and New SOA.
4. IIS Flow 4.4.21 – Discrepancy between flow and text in step 5. Flow incorrectly shows status as “failed” rather than “active”.
Final Resolution:
Update IIS.
1. Correct picture (remove the word “SOA”).
2. Correct the notification reference (change from an SAVC to an AVC).
3. Correct picture and text (change to reflect behavior, Old SOA – both SV1 and SV2, New SOA – just SV2).
4. Correct the flow (change from “failed” to “active”) to match the status in the text.
Implemented in IIS 3.2.1a.
Related Release:
Implemented in IIS 3.2.1a.
Status: Implemented