NANC 021
IIS Section 6 note modification
Origination Date :03/05/1997
Originator:Perot
Description:
The note on page 53 of IIS 1.4 in section 6.1 should be modified as follows:
NOTE: The order of messages in the message flows must be followed by the NPAC SMS, SOA, and LSMS systems with the exception of the return of the M-EVENT-REPORT confirmations.
Final Resolution:
IIS was modified in the 1.0 release.
Related Release:
1.0
Status: Implemented