NANC 025
IIS 6.5.4.1/6.5.4.2 Flow Modification
Origination Date :03/17/1997
Originator:Perot Systems
Description:
In IIS 1.5 flows 6.5.4.1 and 6.5.4.2 step b should have the LNPType removed from the verbiage and should indicate a range of TNs can be specified. The second sentence in step b should begin as follows: “The M-ACTION specifies either the subscriptionVersionId, or subscription TN or range of TNs, and also has….”
Final Resolution:
IIS was modified in the 1.0 release.
Related Release:
1.0
Status: Implemented