NANC 026
IIS 6.5.5.2 Flow Modification
Origination Date :03/17/1997
Originator:Perot Systems
Description:
In IIS 1.5 flow 6.5.5.2 step c should read “subscription version TN or subscription version ID” instead of “and”.
Final Resolution:
IIS was modified in the 1.0 release.
Related Release:
1.0
Status: Implemented