NANC 038
IIS Flow 6.4.1.6 Clarification
Origination Date :03/20/1997
Originator:MCI
Description:
In flow 6.4.1.6 in IIS 1.5, step (d), there is a sentence reading: ' ...exist with this LRN that have....' This flow is regarding NPA-NXX Deletion by the SOA, and should be corrected to read: '... exist with this NPA-NXX that have...'.
Final Resolution:
IIS was modified in the 1.0 release.
Related Release:
1.0
Status: Implemented