NANC 059
Old SP Concurrence Request Notification
Origination Date :04/11/1997
Originator:AT&T
Description:
Old SP Concurrence Request Notification
The GDMO definition for the subscriptionVersionOldSP-ConcurrenceRequest is slightly different than the ASN.1 definition and should be corrected.
The attribute ids shown in the notification are as follows:
AND ATTRIBUTE IDS
tn subscriptionTN,
version-id subscriptionVersionId,
service-prov-id subscriptionNewCurrentSP,
service-prov-due-date
subscriptionNewSP-DueDate,
service-prov-creation-time-stamp
subscriptionNewSP-CreationTimeStamp,
access-control accessControl;
However the ASN.1 contains the following:
VersionCreateConcurrenceRequest ::= SEQUENCE {
tn PhoneNumber,
version-id LnpKey,
service-prov-id ServiceProvId,
service-prov-due-date GeneralizedTime,
service-prov-authorization-time-stamp
GeneralizedTime
access-control LnpAccessControl
Final Resolution:
The ASN.1 should be updated to state service-prov-authorization-time-stamp to be service-prov-authorization-creation-time-stamp. The GDMO for the subscriptionVersionOldSP-ConcurrenceRequest should be modified to replace service-prov-creation-time-stamp with service-prov-authorization-creation-time-stamp. The GDMO for subscriptionVersionNewSP-CreateRequest should have service-prov-authorization-time-stamp should be replaced with service-prov-authorization-creation-time-stamp. The service-prov-authorization should also be replaced with service-prov-old-authorization in the subscriptionVersionNewSP-CreateRequest.
This change will be made in release 1 per the NANC 4/18 conference call as part of IIS 1.1.
Related Release:
1.1
Status: Implemented