NANC 090
SP Download Indicator Addition to IIS
Origination Date :04/30/1997
Originator:MCI
Description:
RR3-1 and RR3-2 refer to a download indicator that is a flag that is set to indicate whether or not a SP wants to received from the NPAC for NPA-NXX or LRN data on their LSMS. This download indicator is associated with a SP but is not available for modification/viewing over the CMIP interface. It has been requested that it be added in a future release.
Final Resolution:
This feature has been requested for a future release. This change has not been associated with a group.
Delete Pending as of 10/10/97.
Related Release:
N/A
Status: Closed