NANC 129
End User Location Type and Value Definition
Origination Date :08/05/1997
Originator:AT&T
Description:
In the NANC IIS V1.2 the following ASN.1 definitions are found:
EndUserLocationType ::= CHOICE {
value [0] NumberString(SIZE2)),
no-value-needed [1] NULL
}
EndUserLocationValue ::= CHOICE {
value [0] NumberString(SIZE(1..12)),
no-value-needed [1] NULL
}
However, in the FRS V1.2 the following is found in Table 3-5:
End User Location Type C(2)
End User Location Value C(12)
where "C" is defined as "Character or Alphanumeric Strings".
Final Resolution:
IIS should be changed to make these fields character. However, at this time since these fields are not being used this change order is on hold. For the interim change order NANC 155 will be used to sync the FRS with the IIS.
Sep LNPAWG (Chicago), no longer needed. Move to Cancel-Pending.
Related Release:
N/A
Status: Closed