NANC 135
Download File Clarifications
Origination Date :08/10/1997
Originator:Perot Team
Description:
The following clarifications for download files defined in FRS 1.4 and 2.2 should be added:
Subscription Versions in the download file are selected by an NPA-NXX begin and end range.
- The name of the Subscription Version file is formatted NPANXX-NPANXX.DD-MM-YYYYHH24MISS, the NPANXX-NPANXX values map to the selection criteria and the time stamp maps to the current time.
- The download reason in all download files is always set to new.
- There are no selection criteria for the NPA-NXX, LRN or SPID down load files. All data is included.
- The name of the Service Provider download file is SPID.DD-MM-YYYYHH24MISS, where the SPID portion is the literal string ‘SPID’.
- The name of the NPA-NXX download file is NPA-NXX.DD-MM-YYYYHH24MISS, where the NPA-NXX portion is the literal string ‘NPA-NXX’.
The name of the LRN download file is LRN.DD-MM-YYYYHH24MISS, where the LRN portion is the literal string ‘LRN’.
Final Resolution:
FRS would be updated in the next release.
Pending review. There is also a file name in the example with a month of 13 that should be corrected.
Moved to closed. Nortel agrees.
Related Release:
1.5
Status: Implemented