NANC 200
Notification of NPA Splits
Origination Date :02/28/1998
Originator:AGCS
Description:
It has been requested that to facilitate synchronization during NPA split, the NPAC via the mechanized interface should notify the SOA and LSMSs. The preferred method would be to have a new managed object that contains all split information. It would still be up to the respective system to perform the splits, but all systems would be in sync. A second alternative would be to have the NPAC issue a notification that states the NPAC is start/ending split processing.
Final Resolution:
Func Backwards Compatible: NO
This change order is related to change order NANC 192 that proposes getting the split information from the LERG.
01/02/02 – NPAC R4.0 as submitted to the LLC in 2000 is not going forward. This change order has been moved back into the “accepted” section of this document.
12/05 – Moved to Cancel-Pending per LNPAWG discussion.
3/06 – moved to Deleted after March LNPAWG meeting
Related Release:
N/A
Status: Closed