NANC 210
IIS Flow 6.5.1.12 Modification
Origination Date :12/31/1969
Originator:
Description:
IIS Flow 6.5.1.12 "Subscription Version Port to Original: Success", states in b., e., and g. that the status is set to "Sending" when an activate is received for a Port to Original, and that status sent to the old and new SP. The NPAC actually sends a status of "Disconnect-Pending". This status only lasts for a few seconds but does result in a notification to the old and new SP. This has not been an issue for any of the SPs during certification but is an inconsistency between the IIS and the NPAC.
Final Resolution:
Submitter is reviewing this change order for accuracy. This change order may be withdrawn.
Closed no action by submitter 4/14/1998.
Related Release:
N/A
Status: Closed