NANC 216
Mass Update by LNP Type
Origination Date :05/15/1998
Originator:AT&T
Description:
It has been requested that LNP Type be added as a selection criteria for subscription versions to the mass update functionality.
Final Resolution:
Backwards Compatible: YES
Discussed on 7/8/98 telecon. This would be a complement to either Number Pooling or NANC 68 (whichever is implemented first). The SPs would like this implemented as soon as possible.
During 7/15/98 face-to-face T&O meeting, Lockheed reported that too far along in the process of the “new” 2.0 release, to include this change order. Possibly include with the National N Pool release.
During August T&O (Detroit), it was requested that this change order be included when the National Number Pooling change order (NANC 109) is submitted to the LLCs.
Dec Natl N Pool (Las Vegas), The functionality requested in this change order has been rolled into National Pooling. Refer to the Pooling FRS requirements, B-760 and B-761. Move to Release 3.0 list.
Related Release:
3.0.0
Status: Implemented