NANC 239
Document the current process for Resynchronization
Origination Date :09/25/1998
Originator:National Number Pooling Sub-Com'ttee
Description:
While reviewing the Natl N Pool requirements, it was noted that the resynchronization functionality is NOT documented in the FRS.
It has been requested by the Sub-Committee to update this information in the FRS.
Also make sure resync functionality for Time Range and NPA-NXX Range, is also documented.
In recovery mode, a full failure SV is NOT sent to the LSMS.
The NPAC uses the Last Modified Timestamp to determine if the SV falls within the resyncing timerange.
3/31/99, Tekelec request. NPAC-LSMS Resynchronization procedure needed when resource limitation exists.
In Appendix B of the NPAC SMS IIS - NANC Version 2.0.0 in section B.7.1, there needs to be a message flow added which describes the proper action(s) to be taken when the NPAC sends a CMISE primitive error: processingFailure/resourceLimitation instead of a successful M-ACTION response with lnpRecovery data.
This change order is a superset of NANC 275.
Final Resolution:
Backwards Compatible: YES
This will be put into the queue of CMA updates to the FRS/IIS. No date has been scheduled.
Apr LNPAWG (DC), another request from the team is to add all five return codes (in M-ACTION reply), and provide some suggested behavior.
Tekelec to look at the CMIP errors, and see if those are needed as well.
May LNPAWG (Baltimore), reported discussion on telecon call, 4/20. The CMA will work on the updates as time permits.
Jul LNPAWG (Ottawa), Aug LNPAWG (Portland), Sep LNPAWG (Chicago), reviewed separate document write-up. See revised version.
Oct LNPAWG (KC), group accepted updates. Move to next doc category.
Related Release:
3.0.1
Status: Implemented