NANC 259
IIS Documentation Change
Origination Date :02/03/1999
Originator:National Number Pooling Sub-Com'ttee
Description:
In the R2 version of the IIS, in Exhibit11, the description associated with the subscriptionVersionStatusAttributeValueChange notification should be updated.
The deleted text is struck-through, and the new text is highlighted:
This notification is issued when the subscription version status is modified. This notification is issued from both
the NPAC SMS to Local SMS interface
and
the
SOA via the SOA
to NPAC SMS interface from the subscriptionVersionNPAC object.
Final Resolution:
Feb LNPAWG (San Ramon), group O.K. with this change order. Move to next doc category.
Related Release:
2.0.1
Status: Implemented