NANC 262
FRS Documentation Change
Origination Date :02/03/1999
Originator:CMA
Description:
Re-send of activation request (RR5-38.4) should have reference to modification removed, and a new requirement (in the re-send section, RR5-38.9) should be added to reflect the re-send of an active SV that failed the initial modify active request. Also, update RR5-38.5 to have consistent words.
RR5-38.4 Resend Subscription Version - Activation Request
NPAC SMS shall resend a Subscription Version activation request, if either
the Subscription Version previously failed activation or an active Subscription Version previously failed modification
, to the designated list of failed Local SMSs via the NPAC SMS to Local SMS Interface upon a Subscription Version resend request.
RR5-38.9 Resend Subscription Version – Modification Request
NPAC SMS shall resend a Subscription Version modification request, if an active Subscription Version previously failed modification, to the designated list of failed Local SMSs via the NPAC SMS to Local SMS Interface upon a Subscription Version resend request.
RR5-38.5 Resend Subscription Version – Disconnect Request
NPAC SMS shall resend a Subscription Version disconnect request, if the Subscription Version previously failed disconnect, to the designated list of failed Local SMSs via the NPAC SMS to Local SMS Interface upon a Subscription Version resend request.
Final Resolution:
Feb LNPAWG (San Ramon), group O.K. with this change order. Move to next doc category.
Related Release:
2.0.1
Status: Implemented