NANC 275
IIS Documentation - Error Flow Diagrams Needed
Origination Date :03/31/1999
Originator:Tekelec
Description:
In section A.1 of the NPAC SMS IIS - NANC Version 2.0.0, it states "The situations under which these errors occur are documented in the message flow diagrams in Appendix B". The message flows defined in Appendix B show successful operations only. Message flows for error situations need to be included.
This change order is a subset of NANC 239, and is therefore being tracked by that change order.
Final Resolution:
Backwards Compatible: YES
Apr LNPAWG (DC), Tekelec to check internally on this change order (depth and breadth), and report back next month.
May LNPAWG (Baltimore), discussed by group. Need text on notification recovery, that if supported, then the expected NPAC behavior is . Need to describe which things are required and which are optional in the message flows. This is applicable to ONLY the recovery message flows. The CMA will work on the updates as time permits.
Related Release:
3.0.0
Status: Implemented