NANC 276
IIS Documentation – Immediate Disconnect B.5.4.1
Origination Date :04/01/1999
Originator:AT&T
Description:
There is a discrepancy between the IIS (Flow B.5.4.1) and the FRS (RR5-24). In the flow, steps b,c,d,e,f document Effective Release Date and disconnect pending status. In this flow, an Effective Release Date is NOT provided (it’s in Flow B.5.4.2 Deferred Disconnect with Effective Release Date). In the requirement (RR5-24) the status of disconnect pending is only set when an ERD is specified.
Final Resolution:
The proposed change is to update Flow B.5.4.1 in steps b,c,d,e,f to remove the Effective Release Date and disconnect pending status.
Apr LNPAWG (DC), group O.K. with this change order. Move to next doc list.
Related Release:
2.0.2
Status: Implemented