NANC 289
R3 Requirements Update – documentation only – from Pooling Assumptions walk-thru
Origination Date :05/27/1999
Originator:TSE
Description:
During the Pooling Assumptions call on 5/26, several requirement updates were discussed. Numbers were assigned to be the appropriate requirement numbers according to where the new requirements should be inserted in the documentation.
Remove SV-428.1 - 428.7.
Remove "partial failure/failed" from SV230, SV240, SV270, and SV280. (to be added to existing change order 227)
Add N-270
The NPAC SMS shall reject a request to delete (de-pool) an NPA-NXX-X if there is an SV with a status of sending as a result of a disconnect request.
Add SV-429
Once an NPA-NXX-X-Deletion has begun, the NPAC SMS shall ensure at completion that no SVs exist with LNP Type of POOL.
In addition, the Pooling Assumption call on 5/19 made the following updates:
Added text <> to N-365
NPAC SMS shall provide to NPAC Personnel only, an indicator on the NPAC Administrative Interface <only after a query> if an associated Block Create Scheduled Event, that has not been executed, exists in the NPAC SMS.
Final Resolution:
Backwards Compatible: YES
Jul LNPAWG (Ottawa), move to next doc category.
Aug LNPAWG (Portland), need to remove B-169.1.3 since the error message references SV-428.x, and all of these requirements have been removed.
Related Release:
3.0.0
Status: Implemented