NANC 304
R3 GDMO documentation-only updates
Origination Date :01/24/2000
Originator:CMA
Description:
1.
-- 1.0 LNP Download Action
lnpDownload ACTION
lnpDownloadBehavior BEHAVIOUR
SOAs can use the lnpDownload action to
recover network data and
notification data.
The lnpNotificationRecovery
action is used to recover
notification data.
Local SMSs can use the lnpDownload
Action to recover network data,
and
subscription version data and
notification data.
The lnpNotificationRecovery
action is used to recover
notification data.
The SOA or LSMS is capable of recovering data based on the association
functions. The SOA recovers network data using the data download association function (dataDownload).
The SOA recovers network data and
notification data using
the network data management association function (networkDataMgmt).
The LSMS recovers network data and subscription data using the data
download association function (dataDownload) and recovers notification
data using the network data management association function
(networkDataMgmt).
2.
-- 15.0 Notification Recovery Action
lnpNotificationRecovery ACTION
lnpNotificationRecoveryBehavior BEHAVIOUR
The SOA or LSMS is capable of recovering data based on the association
functions. The SOA recovers network data using the data download association function (dataDownload). The SOA recovers network data and notification data using
the network data management association function (networkDataMgmt).
The LSMS recovers network data and subscription data using the data
download association function (dataDownload) and recovers notification
data using the network data management association function
(networkDataMgmt).
3.
-- 31.0 LNP Service Provider LRN Last Modified Time Stamp
serviceProvLRN-CreationTimeStamp ATTRIBUTE
WITH ATTRIBUTE SYNTAX LNP-ASN1.GeneralTime;
MATCHES FOR EQUALITY, ORDERING;
BEHAVIOUR serviceProvLRN-CreationTimeStampBehavior;
REGISTERED AS {LNP-OIDS.lnp-attribute 31};
Change the name from “Last Modified Time Stamp“ to “Creation Time Stamp”.
4.
-- 20.0 LNP subscription Version Managed Object Class
The Local SMS must be able to support a scoped request (M-GET,
M-SET, M-DELETE) with a filter for equality on the subscriptionLNPType
attribute, and
equality and ordering on the subscriptionTN from the
NPAC SMS.
-- 29.0 Number Pool Block Data Managed Object Class
The Local SMS must support equality and ordering on the numberPoolBlockNPA-NXX-X
attribute in a scoped and filtered request for mass updates and audits .
5.
-- 12.0 LNP NPAC SMS Managed Object Class
lnpNPAC-SMS-Behavior BEHAVIOUR
The subscriptionVersionNewNPA-NXX is used to support the Release 1.4 for
number pooling.
6.
-- 31.0 Service Provider NPA-NXX-X Data Managed Object Class
serviceProvNPA-NXX-X-Behavior BEHAVIOUR
The subscriptionVersionNewNPA-NXX will be sent to notify the service
providers SOA and Local SMS systems of the creation of this object
if the creation is the first usage of the NPA-NXX. However, this notification is not emitted from the serviceProvNPA-NXX-X object, but rather from the lnpNPAC-SMS object (top-level) instead.
7.
-- 21.0 LNP NPAC Subscription Version Managed Object Class
subscriptionVersionNPAC-Behavior BEHAVIOUR
Attribute value change notifications will be sent to both service
provider SOAs when the following attribute values change for
a pending, cancel-pending, or conflict subscription
versions (AVCs are not sent for modify active subscription versions) :
Final Resolution:
Pure Backwards Compatible: YES
May 00 LNPAWG (Atlanta), group consensus is to release a new GDMO by COB, Friday, 5/12.
Related Release:
3.0.2
Status: Implemented