NANC 317
Name Change to service-prov-download-reason in ASN.1 – ASN.1 Recompile
Origination Date :09/06/2000
Originator:TSE
Description:
In Release 3.0.2 of the ASN.1 a change was made to update the element name for the service-prov-download-reason in the NPA-NXX-X DownloadData. A change order was never written to cover this change.
Prior to Release 3.0.2 of the ASN.1 the element name was:
service-prov-download-reason [5] DownloadReason
Release 3.0.2 of the ASN.1 changed the element name to:
service-prov-npa-nxx-x -download-reason [5] DownloadReason
This change required a recompile which has already been done.
Final Resolution:
This change has already been implemented in Release 3.0.2 of the ASN.1.
This change order is being written after the fact for tracking purposed only.
Sept 00 – At the time this change was implemented (May 00) it was an ASN.1 recompile (implemented in ASN.1 version 3.0.2). Now it is a document only change order for tracking purposed. It will be incorporated into the IIS version 3.0.2 which will contain the ASN.1 3.0.2 and so noted.
Related Release:
3.0.2
Status: Implemented