NANC 333
Doc Only Change Order for GDMO & IIS
Origination Date :09/26/2001
Originator:TSE
Description:
Doc Only Change Order for GDMO & IIS: Clarification needed in the GDMO & two IIS Flows for the subscriptionVersionRangeObjectCreation notification (one of the new range notifications in change order NANC 179 for NPAC SMS Release 3.1).
In the ObjectInfo for subscriptionVersionRangeObjectCreationInfo there are attribute assertions for subscriptionVersionId and subscriptionTN as is done for the single objectCreation notification for a subscription version. These values would be the SVID and TN for the first TN in the list or range for the subscriptionVersionRangeObjectCreation notification.
GDMO changes needed for clarification of the subscriptionVersionRangeObjectCreation notification:
lnpSubscriptionsBehavior BEHAVIOUR
DEFINED AS !
Local SMS and NPAC SMS Managed Object
The Local SMS (Data Download Association Function) and the service
provider SOA (SOA Management Association Function) can M-GET any
lnpSubscriptions object. The lnpSubscriptionsName attribute
is read only and can not be changed via the Local SMS Interface
once the object has been created. The value of
lnpSubscriptionsName will always be "lnpSubscriptions".
•
•
•
The SOA receives subscriptionVersionRangeObjectCreation notifications
if their Service Provider TN Range Notification Indicator is set to
TRUE on the NPAC SMS. The subscriptionVersionRangeObjectCreationPkg is
used to send the subscriptionVersionRangeObjectCreation notification.
When this package is sent, it will include one set of information for
the TN range, plus a paired list of TN/Subscription Version ID
combinations. If the feature data does not apply to all TNs in the
range, notifications will be broken up into smaller TN Range
Notifications such that the feature data applies to all TNs in the
smaller TN Range, and will be sent in separate messages.
The ObjectInfo field will contain the same data as the current object
creation notifications sent to the old and new service provider. The
TN and SVID fields that are sent in the single object creation
notification will contain the TN and subscription version id for the
first TN in the range or list.
-- 16.0 LNP Subscription Version Range Object Creation Notification
subscriptionVersionRangeObjectCreation NOTIFICATION
BEHAVIOUR subscriptionVersionRangeObjectCreationBehavior;
WITH INFORMATION SYNTAX LNP-ASN1.VersionRangeObjectCreation
AND ATTRIBUTE IDS
range-object-creation-info subscriptionVersionRangeObjectCreationInfo,
access-control accessControl;
REGISTERED AS {LNP-OIDS.lnp-notification 16};
subscriptionVersionRangeObjectCreationBehavior BEHAVIOUR
DEFINED AS !
This notification type is used to report creation of subscription
versions for range operations. It uses the object creation
notification as defined in M.3100.
The service provider supports this notification if the Service
Provider TN Range Notification Indicator is set on the NPAC SMS and
the service provider will no longer receive an
object creation notification for a subscription version.
This ObjectInfo field will contain the same data as the current
object creation notifications sent to the old and new service
provider. The TN and SVID fields that are sent in the single
object creation notification will contain the TN and
subscription version id for the first TN in the range or list.
This notification is prioritized and transmitted
according to its SOA Notification Priority tunable in the NPAC
SMS.
IIS changes need for clarification subscriptionVersionRangeObjectCreation notification:
For flow B.5.1.1, step 5 should be changed as follows:
5. If the M-ACTION was successful, the NPAC SMS issues, depending upon the old service provider’s TN Range Notification Indicator, an objectCreation or subscriptionVersionRangeObjectCreation M-EVENT-REPORT containing the following attributes to old service provider SOA of subscriptionVersionNPAC creation:
subscriptionVersionId
subscriptionTN
subscriptionOldSP
subscriptionNewCurrentSP
subscriptionOldSp-DueDate
subscriptionOldSP-Authorization
subscriptionOldSP-AuthorizationTimeStamp
subscriptionStatusChangeCauseCode
(if subscriptionOldSP-Authorization set to false)
subscriptionVersionStatus
If the notification is a subscriptionVersionRangeObjectCreation then the TN and SVID are the TN and SVID of the first TN in the range or list.
For flow B.5.1.2, step 5 should be changed as follows:
5. If the M-ACTION was successful, NPAC SMS issues, depending upon the old service provider’s TN Range Notification Indicator, an objectCreation or subscriptionVersionRangeObjectCreation M-EVENT-REPORT containing the following attributes to old service provider SOA of subscriptionVersionNPAC creation:
subscriptionVersionId
subscriptionTN
subscriptionOldSP
subscriptionNewCurrentSP
subscriptionNewSP-CreationTimeStamp
subscriptionVersionStatus
subscriptionNewSP-DueDate
If the notification is a subscriptionVersionRangeObjectCreation then the TN and SVID are the TN and SVID of the first TN in the range or list.
Final Resolution:
Incorporate into the GDMO and IIS immediately and re-publish these documents as Release 3.1.1
October 2001 meeting: Accepted by LNPA WG. To be included in next release of GDMO & IIS. Move to “Next Documentation Release Change Orders” sub-section of the “Accepted Change Orders” section of this document.
Implemented in IIS 3.2.0 and GDMO 3.2.0.
Related Release:
Implemented in IIS 3.2.0 and GDMO 3.2.0.
Status: Implemented