NANC 336
Doc Only Change Order for IIS: Flows B.4.4.3 and B.4.4.6 have typos that need to be corrected.
Origination Date :10/25/2001
Originator:CMA
Description:
The notes at the end of the diagram and the end of the text need to be corrected as follows:
Note at end of diagram currently reads:
NPAC SMS waits for all the subscriptionVersionLocalSMS-CreateResults notifications (default 1 hour)
Should read:
NPAC SMS waits for all the subscriptionVersionLocalSMS-Action Results notifications (default 1 hour)
Note at end of text currently reads:
The NPAC SMS now waits for all the subscriptionVersionLocalSMS-CreateResults M-EVENT-REPORTs a tunable amount of time (default 1 hour)
Should read:
The NPAC SMS now waits for all the subscriptionVersionLocalSMS-Action Results M-EVENT-REPORTs a tunable amount of time (default 1 hour)
Final Resolution:
Incorporate into next release of IIS.
11/14/01 – Reviewed at November 2001 LNPA WG. Service Providers to verify internally that this change order does not have an impact on their local systems. Leave in “open” status until December 2001 meeting.
12/12/01 – Move to ‘accepted’.
Implemented in IIS 3.2.0.
Related Release:
Implemented in IIS 3.2.0.
Status: Implemented