NANC 337
Doc Only Change Order for IIS: Flow B.8.3 – note at the beginning of the text needs to be updated.
Origination Date :10/25/2001
Originator:CMA
Description:
Currently reads:
Search the subscription database for subscription versions that match the specified mass update criteria. Perform steps c-through-f for the allowable range of subscription versions. The NPAC logs as errors subscription versions that match the mass update criteria but are in the wrong state.
Should read:
Search the subscription database for subscription versions that match the specified mass update criteria. Perform steps 1 through 4 for the allowable range of subscription versions. The NPAC logs as errors subscription versions that match the mass update criteria but are in the wrong state.
Final Resolution:
Incorporate into next release of IIS.
11/14/01 – Reviewed at November 2001 LNPA WG. Service Providers to verify internally that this change order does not have an impact on their local systems. Leave in “open” status until December 2001 meeting.
12/12/01 – Move to ‘accepted’.
Implemented in IIS 3.2.0.
Related Release:
Implemented in IIS 3.2.0.
Status: Implemented