NANC 366
Doc Only Change Order for FRS/IIS: Remove references that specify GUI is in Central Time
Origination Date :09/18/2002
Originator:Neustar
Description:
Central Time references need to be corrected. According to the current specification, the NPAC GUI is shown in Central Time. However, the displayed time zone is based on the local time zone selected for that specific PC. This change order requests that the time zone reference be corrected to avoid confusion.
Final Resolution:
Pure Backwards Compatible: YES
Change the current documentation to correct hard-coded references to Central Time. Both the FRS and IIS should be checked for this update.
Jan ’03 LNPAWG, approved, move to next documentation category. The only exceptions to this rule are the two fields in the Number Pool Block.
Implemented in FRS 3.2.1a and IIS 3.2.1a.
Related Release:
Implemented in FRS 3.2.1a and IIS 3.2.1a.
Status: Implemented